当前位置 : 洛杉矶时报增刊

Asia’s first FPSO completed in Qingdao 发布日期:2023/8/30 来源:International daily 打印

On August 17, Asia’s first cylindrical Floating Production Storage and Offloading (FPSO), which is named Haiyang Shiyou 122, also known as Offshore Oil 122 was completed in the Qingdao yard of China National Offshore Oil Corporation (CNOOC). This marks a new breakthrough in the R&D and manufacturing technical capabilities of China’s deepwater super-large offshore and gas equipment.

The Haiyang Shiyou 122 adopts a new cylindrical structure design, that saves steel consumption and has good overall stability and the strong ability to withstand severe sea conditions, which can reduce engineering investment and effectively improve economic applicability. With a maximum diameter of about 90 meters, the platform is composed of the hull and functional modules on the deck. With a dead weight of 37,000 tonnes, this FPSO has a maximum displacement of 100,000 tonnes, a maximum storage capacity of 60,000 tonnes, and the ability to operate continuously for 15 years without returning to the dock.

The FPSO, which has now entered a final assembly and integration phase, will be jointly commissioned with Asia’s first deepwater jacket platform, Haiji, after completion next year in China’s first secondary development project for a deepwater oilfield, creating a new project mode to explore the continental slope oilfield of the South China Sea with dry wellhead and providing a new way to explore deepwater oil and gas fields in China.  (Wang Kai)

图2 - 复件(2).jpg

The exterior of Asia’s first cylindrical FPSO. By Zhang Jingang 


    24小时最新动态

    热点排行

    图片新闻

國際日報 (International Daily News)版權所有. 提醒:業者若未經許可,擅自引用國際日報網內容將面對法律行動. 第三方公司可能在國際日報網站宣傳他們的產品或服務, 您跟第三方公司的任何交易與國際日報網站無關,國際日報將不會對可能引起的任何損失負責. 信息網絡傳播視聽節目許可證:2032302 互聯網新聞信息服務許可證-45122353001  X公網安備 450103024350154號 互聯網出版許可證(X)字003號
©国际日报网版权所有